Supplier · public contract awards

Cedar Engineering

As printed in the NPTA’s Tenders Awarded listing: Cedar Engineering

1award
1buyer
GYD 63.2Mawarded
5openings bid at

Dated 10 Jul 2026.

Buyer

The award

Bids at tender openings

from NPTA’s minutes of tender openings

5 openings where the minutes read out a bid from this supplier. Prices are as read out, before evaluation; a bid on several lots of one opening counts once.

No win record: we hold the award for 2 openings it bid at, and give a record from 5. Each bid’s outcome is listed below.

Limits. The minutes we read cover 941 openings from 19 Feb 2026 to 3 Nov 2026; nothing earlier is counted. We hold the award for 409 of them. The NPTA’s awards page lags the openings (the newest award we hold is dated 6 Nov 2026), and an opening reaches its award only through its file number. A bid is this supplier’s only when the name the minutes print matches a name the awards page printed for it, so some of its bids may be missing here.

The award names others (2)

We hold the award, and no row of it names this supplier.

No award we hold (3)

Not decided yet, not posted on the awards page yet, or not joined to its opening. Not counted either way.

  • Supply & Installation of Transmission Mains at Adventure, Reg #6 (Lots 1-4) Form of Tender Page BSD Not Seen Zeebo & Sons Construction Inc. L2 Zeebo & Sons Construction Inc. L3 Zeebo & Sons Construction Inc. L4Opened 29 Oct 2026 · File 280/2026/34 · title as the minutes print it; no tender page
    No award held
    • Lot 1GYD 395,917,500
    • Lot 2GYD 364,638,500
    • Lot 3GYD 335,540,000
    • Lot 4GYD 379,373,000
    No award we hold for this file numberMinutes PDF ↗
  • Supply & Installation of Transmission Mains at Adventure, Reg #6 (Lots 1-4) Zeebo & Sons Construction Inc. L2 Zeebo & Sons Construction Inc. L3 Zeebo & Sons Construction Inc. L4Opened 29 Oct 2026 · File 280/2026/34 · title as the minutes print it; no tender page
    No award held
    • Lot 1GYD 395,917,500
    • Lot 2GYD 364,638,500
    • Lot 3GYD 335,540,000
    • Lot 4GYD 379,373,000
    No award we hold for this file numberMinutes PDF ↗
  • Infrastrusture Devlopment Works at Burma, WCB, Region #5 - Lot 3Opened 4 Mar 2026 · File 36/2026/45 · title as the minutes print it; no tender page
    No award held
    • Price read outGYD 195,595,218
    No award we hold for this file numberMinutes PDF ↗

How this page is built

Every award here is a row of the National Procurement and Tender Administration’s Tenders Awarded listing, counted the way each tender’s page lists its awards. The names are as the NPTA prints them. We match them to one supplier by rule — the same name, or a spelling at least 90% alike — and have not checked any register for who the supplier is. A value the NPTA does not publish is never shown or added up, and amounts in Guyana and US dollars are totalled apart.

The bids are the rows of the NPTA’s minutes of tender openings whose bidder name matches one of the names above, each with its minutes PDF. A bid on several lots of one opening counts once. An opening is decided when we hold its award: the awards page names the same file number, or names the advert the opening was matched to. Every award row printed under that file number counts, since the awards page can file one contract’s lots under several records. The win record counts decided openings only, never an opening still waiting for its award, and is given from 5 decided openings. An opening whose award names this supplier while no row of its minutes is linked to it is listed under Won and left out of the record: a bid printed under a name we do not match, or in a row we could not read, is found only when it wins, so counting them would count wins and not losses.

An award that is not this supplier’s can be reported from its tender’s page. What each label means is on the methodology page.

Alerts are planned.

Checking back is the manual version. Alerts that bring new notices to you are planned. Leave your email to register interest. We don’t send any email yet.