Eric Bess Construction
As printed in the NPTA’s Tenders Awarded listing: Eric Bess Construction
Dated 26 Aug 2025 to 24 Nov 2025. 2 awards print no date.
Buyers
Every award (5)
- Extension of Laluni Primary SchoolGYD 14.9M
Bids at tender openings
from NPTA’s minutes of tender openings6 openings where the minutes read out a bid from this supplier. Prices are as read out, before evaluation; a bid on several lots of one opening counts once.
Won 0 of the 5 decided openings it bid at, Apr–Jul 2026.
An opening is decided when we hold its award. A win is an award row naming this supplier. 1 other opening it bid at has no award we hold and is not counted.
Limits. The minutes we read cover 941 openings from 19 Feb 2026 to 3 Nov 2026; nothing earlier is counted. We hold the award for 409 of them. The NPTA’s awards page lags the openings (the newest award we hold is dated 6 Nov 2026), and an opening reaches its award only through its file number. A bid is this supplier’s only when the name the minutes print matches a name the awards page printed for it, so some of its bids may be missing here.
The award names others (5)
We hold the award, and no row of it names this supplier.
- Reconstruction of Agricola PICOpened 16 Jul 2026 · File 335/2026/40Award names others
- Price read outGYD 318,553,792
- Construction of Floor to Include Classroom Above Workshop at Essequibo Technical InstituteOpened 16 Jul 2026 · File 337/2026/40Award names others
- Price read outGYD 59,829,850
- Reconstruction of Kingston Secondary SchoolOpened 16 Jul 2026 · File 338/2026/40Award names others
- Price read outGYD 317,160,500
- Construction of New Wing at Mon Repose Primary SchoolOpened 7 Apr 2026 · File 05/2026/74Award names others
- Price read outGYD 88,978,250
- Construction of New Wing at Mon Repos Primary SchoolOpened 7 Apr 2026 · File 06/2026/74Award names others
- Price read outGYD 83,234,350
No award we hold (1)
Not decided yet, not posted on the awards page yet, or not joined to its opening. Not counted either way.
- Extension of Clonbrook Nursery SchoolOpened 7 Apr 2026 · File 03/2026/74 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 32,208,230
No award we hold for this file numberMinutes PDF ↗
How this page is built
Every award here is a row of the National Procurement and Tender Administration’s Tenders Awarded listing, counted the way each tender’s page lists its awards. The names are as the NPTA prints them. We match them to one supplier by rule — the same name, or a spelling at least 90% alike — and have not checked any register for who the supplier is. A value the NPTA does not publish is never shown or added up, and amounts in Guyana and US dollars are totalled apart.
The bids are the rows of the NPTA’s minutes of tender openings whose bidder name matches one of the names above, each with its minutes PDF. A bid on several lots of one opening counts once. An opening is decided when we hold its award: the awards page names the same file number, or names the advert the opening was matched to. Every award row printed under that file number counts, since the awards page can file one contract’s lots under several records. The win record counts decided openings only, never an opening still waiting for its award, and is given from 5 decided openings. An opening whose award names this supplier while no row of its minutes is linked to it is listed under Won and left out of the record: a bid printed under a name we do not match, or in a row we could not read, is found only when it wins, so counting them would count wins and not losses.
An award that is not this supplier’s can be reported from its tender’s page. What each label means is on the methodology page.
Alerts are planned.
Checking back is the manual version. Alerts that bring new notices to you are planned. Leave your email to register interest. We don’t send any email yet.