Nicozy General Construction
As printed in the NPTA’s Tenders Awarded listing: Nicozy General Construction
Dated 27 Jun 2025 to 22 May 2026. 1 award prints no date.
Buyers
Every award (5)
Bids at tender openings
from NPTA’s minutes of tender openings21 openings where the minutes read out a bid from this supplier. Prices are as read out, before evaluation; a bid on several lots of one opening counts once.
Won 1 of the 10 decided openings it bid at, Apr–Aug 2026.
An opening is decided when we hold its award. A win is an award row naming this supplier. 11 other openings it bid at have no award we hold and are not counted. It also won 1 opening where no row of the minutes is linked to it: its bid is printed under a name we do not match, or in a row we could not read. That opening is listed under Won and not counted, since such bids are found only when they win.
Limits. The minutes we read cover 941 openings from 19 Feb 2026 to 3 Nov 2026; nothing earlier is counted. We hold the award for 409 of them. The NPTA’s awards page lags the openings (the newest award we hold is dated 6 Nov 2026), and an opening reaches its award only through its file number. A bid is this supplier’s only when the name the minutes print matches a name the awards page printed for it, so some of its bids may be missing here.
Won (2)
An award row printed under the opening’s file number names this supplier.
- Rehablilitation of Shed at MMA/ADA Seed Facility Phase IIOpened 2 Apr 2026 · File 126/2026/21Won
- Price read outGYD 26,817,893
- Rehabiliatation/ Construction of Bridges, Lots, 1-61Opened 25 Feb 2026 · File 06/2026/31Won
The award names this supplier, but no row of these minutes is linked to it: its bid is printed under a name we do not match to it, or in a row our reader could not read. Not counted in the record above.
The award names others (9)
We hold the award, and no row of it names this supplier.
- Rhabilitation of Existing Timber Walkway at Mahaicony River, Region No.5Opened 4 Aug 2026 · File 324/2026/21Award names others
- Price read outGYD 13,030,000
- Construction of Drug Storage Bond at Paradise Health Post, Region No.4Opened 28 May 2026 · File 09/2026/74Award names others
- Price read outGYD 29,464,710
- Construction of Concrete Drain from Railway Line to Bennet Dam, Rosignol Region No. 5Opened 15 Apr 2026 · File 06/2026/75Award names others
- Price read outGYD 28,155,835
- Continuation of Beach Dam Golden Fleece, Catherine, Region No. 5Opened 15 Apr 2026 · File 07/2026/75Award names others
- Price read outGYD 17,690,940
- Construction of Section of Farm to Market Road at Quarkers HallOpened 15 Apr 2026 · File 10/2026/75Award names others
- Price read outGYD 15,011,220
- Extension of Mahaicony Secondary School, Region No. 5Opened 7 Apr 2026 · File 01/2026/75Award names others
- Price read outGYD 34,900,779
- Extension of Airy Hall Nursery School, Region No. 5Opened 7 Apr 2026 · File 03/2026/75Award names others
- Price read outGYD 18,258,625
- Extension of No. 29 Primary School, Region No. 5Opened 7 Apr 2026 · File 04/2026/75Award names others
- Price read outGYD 20,574,012
- Extension of Woodley Park Secondary School, Region No. 5Opened 7 Apr 2026 · File 05/2026/75Award names others
- Price read outGYD 16,821,462
No award we hold (11)
Not decided yet, not posted on the awards page yet, or not joined to its opening. Not counted either way.
- 1. Construction of Drainage Structure at No.49 Stanleytown, New Amsterdam, Region No.6 (EE$36,086,600) RETENDEROpened 8 Oct 2026 · File 397/2026/21No award held
- Price read outGYD 34,901,300
No award we hold for this file numberMinutes PDF ↗ - 1. Construction of Control Structure at Cove and John, East Coast Demerara, Region No.4 (EE$24,441,700)Opened 8 Oct 2026 · File 398/2026/21No award held
- Price read outGYD 21,021,900
No award we hold for this file numberMinutes PDF ↗ - 1. Construction of Control Structure at Nabaclis, East Coast Demerara, Region No.4Opened 8 Oct 2026 · File 399/2026/21No award held
- Price read outGYD 22,563,500
No award we hold for this file numberMinutes PDF ↗ - Construction of Section of Farm to Market Access at Murphy DamOpened 15 Apr 2026 · File 09/2026/75 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 18,780,371
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation of Concrete Bridge at Foulis Hole Cultivation Right Bank Abary CreekOpened 14 Apr 2026 · File 170/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 38,100,563
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation of Concrete Bridge at Esah & Jacob Along Phase 2 All Weather RoadOpened 14 Apr 2026 · File 172/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 26,384,138
No award we hold for this file numberMinutes PDF ↗ - Extension of Clonbrook Nursery SchoolOpened 7 Apr 2026 · File 03/2026/74 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 32,758,400
No award we hold for this file numberMinutes PDF ↗ - Construction of 1.5km All Weather Road at Britannia Cultivation AreaOpened 7 Apr 2026 · File 127/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 74,031,300
No award we hold for this file numberMinutes PDF ↗ - Mechanical Excavation of Channel & Clearing of Vegetation at Cattle Pasture Main Canal-KingellyOpened 7 Apr 2026 · File 128/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 18,710,000
No award we hold for this file numberMinutes PDF ↗ - Construction of 2.6km All Weather Road at Shieldstown VillageOpened 7 Apr 2026 · File 131/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 189,909,300
No award we hold for this file numberMinutes PDF ↗ - Construction of AI Cattle Pen, Mon ReposOpened 7 Apr 2026 · File 142/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 24,110,446
No award we hold for this file numberMinutes PDF ↗
How this page is built
Every award here is a row of the National Procurement and Tender Administration’s Tenders Awarded listing, counted the way each tender’s page lists its awards. The names are as the NPTA prints them. We match them to one supplier by rule — the same name, or a spelling at least 90% alike — and have not checked any register for who the supplier is. A value the NPTA does not publish is never shown or added up, and amounts in Guyana and US dollars are totalled apart.
The bids are the rows of the NPTA’s minutes of tender openings whose bidder name matches one of the names above, each with its minutes PDF. A bid on several lots of one opening counts once. An opening is decided when we hold its award: the awards page names the same file number, or names the advert the opening was matched to. Every award row printed under that file number counts, since the awards page can file one contract’s lots under several records. The win record counts decided openings only, never an opening still waiting for its award, and is given from 5 decided openings. An opening whose award names this supplier while no row of its minutes is linked to it is listed under Won and left out of the record: a bid printed under a name we do not match, or in a row we could not read, is found only when it wins, so counting them would count wins and not losses.
An award that is not this supplier’s can be reported from its tender’s page. What each label means is on the methodology page.
Alerts are planned.
Checking back is the manual version. Alerts that bring new notices to you are planned. Leave your email to register interest. We don’t send any email yet.