Tenders/ICT/Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4

Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4

Guyana Energy Agency
AwardedICTReported. Confidence grade B, score 0.76.
Deadline—
Bid opening—
Est. valueNot published
Lots1
LanguageEnglish
First seen2026-11-11
Dotted gold underline = traced to a source · see evidence
Award — public record
awarded 2025-05-14 · Unknown
—2020 FMCGGuyanaGYD 67M
—2020 FMCGGuyanaGYD 296.1M
—2020 FMCGGuyanaGYD 348.4M
—2020 FMCGGuyanaGYD 173.1M
—2020 FMCGGuyanaGYD 67M
—2020 FMCGGuyanaGYD 296.1M
—2020 FMCGGuyanaGYD 348.4M
—2020 FMCGGuyanaGYD 173.1M

Description

No description was published with this notice.

Evidence

6 fields · every one traced
EntityGuyana Energy Agency

“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”

confirmed in 8 snapshots · Nov 11
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28985"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$348,402,393</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28986"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$296,052,519</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28987"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$66,965,814</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29348"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $173,096,662 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29349"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $348,402,393 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29350"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $296,052,519 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29351"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $66,965,814 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
Categoryict

“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”

confirmed in 8 snapshots · Nov 11
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28985"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$348,402,393</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28986"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$296,052,519</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28987"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$66,965,814</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29348"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $173,096,662 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29349"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $348,402,393 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29350"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $296,052,519 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29351"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $66,965,814 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
Statusawarded

“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”

confirmed in 8 snapshots · Nov 11
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28985"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$348,402,393</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28986"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$296,052,519</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28987"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$66,965,814</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29348"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $173,096,662 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29349"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $348,402,393 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29350"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $296,052,519 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29351"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $66,965,814 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
TitleDesign Supply Installation and Commission…

“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”

confirmed in 8 snapshots · Nov 11
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28985"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$348,402,393</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28986"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$296,052,519</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28987"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$66,965,814</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29348"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $173,096,662 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29349"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $348,402,393 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29350"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $296,052,519 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29351"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $66,965,814 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
Show all 6 receipts
Bids Received3

“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”

confirmed in 8 snapshots · Nov 11
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28985"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$348,402,393</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28986"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$296,052,519</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28987"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$66,965,814</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29348"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $173,096,662 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29349"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $348,402,393 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29350"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $296,052,519 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29351"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $66,965,814 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
Procurement MethodNCB

“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”

confirmed in 8 snapshots · Nov 11
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28984"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$173,096,662</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28985"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$348,402,393</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28986"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$296,052,519</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="28987"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td>$66,965,814</td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29348"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $173,096,662 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29349"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $348,402,393 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29350"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $296,052,519 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”
  • 2026-11-10 · 23:36 GYTconf 0.95“<tr data-row_id="29351"><td>Guyana Energy Agency</td><td>136/2025/02</td><td>2020 FMCG Inc.</td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems and Distribution Networks for Hinterland Communities in Guyana Lots 1-4</td><td> $66,965,814 </td><td>G$</td><td>NCB</td><td>3</td><td>14/05/2025</td><td>15/05/2025</td></tr>”

Timeline

First seen2026-11-11
Awarded2025-05-14
Awarded2025-05-14
Awarded2025-05-14
Awarded2025-05-14
Awarded2025-05-14
Awarded2025-05-14
Awarded2025-05-14
Awarded2025-05-14

More from Guyana Energy Agency

Want alerts for notices like this?

New notices are added as our collectors find them, each linked back to the document it came from. Alerts are planned. Leave your email to register interest. We don’t send any email yet.

Report an issue with this tender

Spotted a wrong value, a misattributed award, or data that should not be public? Tell us below — every report is reviewed by a person.