Tenders/EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.

EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.

Halliburton Guyana Inc.
ClosedUncategorisedReported. Confidence grade C, score 0.54.
Deadline2026-02-15closed
Bid opening—
Est. valueNot published
Lots1
LanguageEnglish
First seen2026-08-04
Dotted gold underline = traced to a source · see evidence

Description

We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation solution that ensures compliance with regulatory discharge requirements and improves operational reliability

Evidence

6 fields · every one traced
Deadline2026-02-15

“02/15/2026”

confirmed in 91 snapshots · Aug 4 – Nov 11
  • 2026-11-11 · 13:33 GYTconf 0.70“02/15/2026”
  • 2026-11-11 · 11:32 GYTconf 0.70“02/15/2026”
  • 2026-11-10 · 11:26 GYTconf 0.70“02/15/2026”
  • 2026-11-06 · 15:03 GYTconf 0.70“02/15/2026”
  • 2026-11-05 · 08:52 GYTconf 0.70“02/15/2026”
  • 2026-11-04 · 12:47 GYTconf 0.70“02/15/2026”
  • 2026-11-04 · 10:46 GYTconf 0.70“02/15/2026”
  • 2026-11-03 · 12:41 GYTconf 0.70“02/15/2026”
  • 2026-11-03 · 10:40 GYTconf 0.70“02/15/2026”
  • 2026-11-03 · 08:40 GYTconf 0.70“02/15/2026”
  • 2026-11-02 · 16:36 GYTconf 0.70“02/15/2026”
  • 2026-11-02 · 10:34 GYTconf 0.70“02/15/2026”
  • 2026-10-30 · 06:15 GYTconf 0.70“02/15/2026”
  • 2026-10-29 · 12:11 GYTconf 0.70“02/15/2026”
  • 2026-10-28 · 16:06 GYTconf 0.70“02/15/2026”
  • 2026-10-21 · 12:48 GYTconf 0.70“02/15/2026”
  • 2026-10-20 · 10:42 GYTconf 0.70“02/15/2026”
  • 2026-10-19 · 16:37 GYTconf 0.70“02/15/2026”
  • 2026-10-19 · 10:36 GYTconf 0.70“02/15/2026”
  • 2026-10-17 · 10:24 GYTconf 0.70“02/15/2026”
  • 2026-10-15 · 16:13 GYTconf 0.70“02/15/2026”
  • 2026-10-15 · 10:12 GYTconf 0.70“02/15/2026”
  • 2026-10-14 · 16:07 GYTconf 0.70“02/15/2026”
  • 2026-10-14 · 10:06 GYTconf 0.70“02/15/2026”
  • 2026-10-12 · 11:54 GYTconf 0.70“02/15/2026”
  • 2026-10-12 · 09:54 GYTconf 0.70“02/15/2026”
  • 2026-10-09 · 15:37 GYTconf 0.70“02/15/2026”
  • 2026-10-08 · 15:31 GYTconf 0.70“02/15/2026”
  • 2026-10-08 · 11:30 GYTconf 0.70“02/15/2026”
  • 2026-10-06 · 17:20 GYTconf 0.70“02/15/2026”
  • 2026-10-06 · 15:19 GYTconf 0.70“02/15/2026”
  • 2026-10-06 · 09:18 GYTconf 0.70“02/15/2026”
  • 2026-10-02 · 16:56 GYTconf 0.70“02/15/2026”
  • 2026-10-02 · 14:55 GYTconf 0.70“02/15/2026”
  • 2026-10-02 · 10:54 GYTconf 0.70“02/15/2026”
  • 2026-10-01 · 16:50 GYTconf 0.70“02/15/2026”
  • 2026-09-29 · 10:36 GYTconf 0.70“02/15/2026”
  • 2026-09-28 · 08:30 GYTconf 0.70“02/15/2026”
  • 2026-09-25 · 16:14 GYTconf 0.70“02/15/2026”
  • 2026-09-24 · 20:09 GYTconf 0.70“02/15/2026”
  • 2026-09-23 · 12:01 GYTconf 0.70“02/15/2026”
  • 2026-09-23 · 10:00 GYTconf 0.70“02/15/2026”
  • 2026-09-22 · 15:56 GYTconf 0.70“02/15/2026”
  • 2026-09-22 · 11:55 GYTconf 0.70“02/15/2026”
  • 2026-09-21 · 11:49 GYTconf 0.70“02/15/2026”
  • 2026-09-18 · 11:31 GYTconf 0.70“02/15/2026”
  • 2026-09-17 · 17:26 GYTconf 0.70“02/15/2026”
  • 2026-09-17 · 15:26 GYTconf 0.70“02/15/2026”
  • 2026-09-17 · 09:24 GYTconf 0.70“02/15/2026”
  • 2026-09-14 · 11:07 GYTconf 0.70“02/15/2026”
  • 2026-09-11 · 16:50 GYTconf 0.70“02/15/2026”
  • 2026-09-10 · 10:43 GYTconf 0.70“02/15/2026”
  • 2026-09-09 · 16:38 GYTconf 0.70“02/15/2026”
  • 2026-09-08 · 14:32 GYTconf 0.70“02/15/2026”
  • 2026-09-08 · 10:31 GYTconf 0.70“02/15/2026”
  • 2026-09-08 · 08:30 GYTconf 0.70“02/15/2026”
  • 2026-09-08 · 06:30 GYTconf 0.70“02/15/2026”
  • 2026-09-07 · 18:27 GYTconf 0.70“02/15/2026”
  • 2026-09-07 · 10:25 GYTconf 0.70“02/15/2026”
  • 2026-09-04 · 14:08 GYTconf 0.70“02/15/2026”
  • 2026-09-04 · 10:07 GYTconf 0.70“02/15/2026”
  • 2026-09-03 · 20:03 GYTconf 0.70“02/15/2026”
  • 2026-09-03 · 18:03 GYTconf 0.70“02/15/2026”
  • 2026-09-03 · 14:02 GYTconf 0.70“02/15/2026”
  • 2026-09-03 · 12:01 GYTconf 0.70“02/15/2026”
  • 2026-09-03 · 10:01 GYTconf 0.70“02/15/2026”
  • 2026-08-30 · 09:37 GYTconf 0.70“02/15/2026”
  • 2026-08-27 · 17:21 GYTconf 0.70“02/15/2026”
  • 2026-08-26 · 17:15 GYTconf 0.70“02/15/2026”
  • 2026-08-26 · 13:14 GYTconf 0.70“02/15/2026”
  • 2026-08-26 · 11:13 GYTconf 0.70“02/15/2026”
  • 2026-08-24 · 11:01 GYTconf 0.70“02/15/2026”
  • 2026-08-24 · 00:59 GYTconf 0.70“02/15/2026”
  • 2026-08-21 · 10:43 GYTconf 0.70“02/15/2026”
  • 2026-08-20 · 16:39 GYTconf 0.70“02/15/2026”
  • 2026-08-18 · 12:26 GYTconf 0.70“02/15/2026”
  • 2026-08-17 · 10:19 GYTconf 0.70“02/15/2026”
  • 2026-08-12 · 15:51 GYTconf 0.70“02/15/2026”
  • 2026-08-12 · 13:50 GYTconf 0.70“02/15/2026”
  • 2026-08-11 · 09:43 GYTconf 0.70“02/15/2026”
  • 2026-08-10 · 15:39 GYTconf 0.70“02/15/2026”
  • 2026-08-10 · 13:38 GYTconf 0.70“02/15/2026”
  • 2026-08-10 · 09:37 GYTconf 0.70“02/15/2026”
  • 2026-08-07 · 09:19 GYTconf 0.70“02/15/2026”
  • 2026-08-07 · 07:19 GYTconf 0.70“02/15/2026”
  • 2026-08-07 · 05:18 GYTconf 0.70“02/15/2026”
  • 2026-08-06 · 17:15 GYTconf 0.70“02/15/2026”
  • 2026-08-06 · 13:14 GYTconf 0.70“02/15/2026”
  • 2026-08-05 · 15:09 GYTconf 0.70“02/15/2026”
  • 2026-08-05 · 11:08 GYTconf 0.70“02/15/2026”
  • 2026-08-04 · 09:01 GYTconf 0.70“02/15/2026”
EntityHalliburton Guyana Inc.

“Halliburton Guyana Inc.”

confirmed in 91 snapshots · Aug 4 – Nov 11
  • 2026-11-11 · 13:33 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-11 · 11:32 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-10 · 11:26 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-06 · 15:03 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-05 · 08:52 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-04 · 12:47 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-04 · 10:46 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-03 · 12:41 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-03 · 10:40 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-03 · 08:40 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-02 · 16:36 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-11-02 · 10:34 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-30 · 06:15 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-29 · 12:11 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-28 · 16:06 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-21 · 12:48 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-20 · 10:42 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-19 · 16:37 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-19 · 10:36 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-17 · 10:24 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-15 · 16:13 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-15 · 10:12 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-14 · 16:07 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-14 · 10:06 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-12 · 11:54 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-12 · 09:54 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-09 · 15:37 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-08 · 15:31 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-08 · 11:30 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-06 · 17:20 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-06 · 15:19 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-06 · 09:18 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-02 · 16:56 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-02 · 14:55 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-02 · 10:54 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-10-01 · 16:50 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-29 · 10:36 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-28 · 08:30 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-25 · 16:14 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-24 · 20:09 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-23 · 12:01 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-23 · 10:00 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-22 · 15:56 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-22 · 11:55 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-21 · 11:49 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-18 · 11:31 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-17 · 17:26 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-17 · 15:26 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-17 · 09:24 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-14 · 11:07 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-11 · 16:50 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-10 · 10:43 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-09 · 16:38 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-08 · 14:32 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-08 · 10:31 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-08 · 08:30 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-08 · 06:30 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-07 · 18:27 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-07 · 10:25 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-04 · 14:08 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-04 · 10:07 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-03 · 20:03 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-03 · 18:03 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-03 · 14:02 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-03 · 12:01 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-09-03 · 10:01 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-30 · 09:37 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-27 · 17:21 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-26 · 17:15 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-26 · 13:14 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-26 · 11:13 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-24 · 11:01 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-24 · 00:59 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-21 · 10:43 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-20 · 16:39 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-18 · 12:26 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-17 · 10:19 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-12 · 15:51 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-12 · 13:50 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-11 · 09:43 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-10 · 15:39 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-10 · 13:38 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-10 · 09:37 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-07 · 09:19 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-07 · 07:19 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-07 · 05:18 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-06 · 17:15 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-06 · 13:14 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-05 · 15:09 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-05 · 11:08 GYTconf 0.95“Halliburton Guyana Inc.”
  • 2026-08-04 · 09:01 GYTconf 0.95“Halliburton Guyana Inc.”
Categoryunknown

“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”

confirmed in 91 snapshots · Aug 4 – Nov 11
  • 2026-11-11 · 13:33 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-11 · 11:32 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-10 · 11:26 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-06 · 15:03 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-05 · 08:52 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-04 · 12:47 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-04 · 10:46 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-03 · 12:41 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-03 · 10:40 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-03 · 08:40 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-02 · 16:36 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-02 · 10:34 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-30 · 06:15 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-29 · 12:11 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-28 · 16:06 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-21 · 12:48 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-20 · 10:42 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-19 · 16:37 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-19 · 10:36 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-17 · 10:24 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-15 · 16:13 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-15 · 10:12 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-14 · 16:07 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-14 · 10:06 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-12 · 11:54 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-12 · 09:54 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-09 · 15:37 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-08 · 15:31 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-08 · 11:30 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-06 · 17:20 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-06 · 15:19 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-06 · 09:18 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-02 · 16:56 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-02 · 14:55 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-02 · 10:54 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-01 · 16:50 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-29 · 10:36 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-28 · 08:30 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-25 · 16:14 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-24 · 20:09 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-23 · 12:01 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-23 · 10:00 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-22 · 15:56 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-22 · 11:55 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-21 · 11:49 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-18 · 11:31 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-17 · 17:26 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-17 · 15:26 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-17 · 09:24 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-14 · 11:07 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-11 · 16:50 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-10 · 10:43 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-09 · 16:38 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-08 · 14:32 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-08 · 10:31 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-08 · 08:30 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-08 · 06:30 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-07 · 18:27 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-07 · 10:25 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-04 · 14:08 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-04 · 10:07 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 20:03 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 18:03 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 14:02 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 12:01 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 10:01 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-30 · 09:37 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-27 · 17:21 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-26 · 17:15 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-26 · 13:14 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-26 · 11:13 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-24 · 11:01 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-24 · 00:59 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-21 · 10:43 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-20 · 16:39 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-18 · 12:26 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-17 · 10:19 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-12 · 15:51 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-12 · 13:50 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-11 · 09:43 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-10 · 15:39 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-10 · 13:38 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-10 · 09:37 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-07 · 09:19 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-07 · 07:19 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-07 · 05:18 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-06 · 17:15 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-06 · 13:14 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-05 · 15:09 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-05 · 11:08 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-04 · 09:01 GYTconf 0.70“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
Statusunknown

“Local Content Register listing has no status column; recorded as unknown (status not asserted).”

confirmed in 91 snapshots · Aug 4 – Nov 11
  • 2026-11-11 · 13:33 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-11 · 11:32 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-10 · 11:26 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-06 · 15:03 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-05 · 08:52 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-04 · 12:47 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-04 · 10:46 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-03 · 12:41 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-03 · 10:40 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-03 · 08:40 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-02 · 16:36 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-11-02 · 10:34 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-30 · 06:15 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-29 · 12:11 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-28 · 16:06 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-21 · 12:48 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-20 · 10:42 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-19 · 16:37 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-19 · 10:36 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-17 · 10:24 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-15 · 16:13 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-15 · 10:12 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-14 · 16:07 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-14 · 10:06 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-12 · 11:54 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-12 · 09:54 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-09 · 15:37 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-08 · 15:31 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-08 · 11:30 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-06 · 17:20 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-06 · 15:19 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-06 · 09:18 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-02 · 16:56 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-02 · 14:55 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-02 · 10:54 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-10-01 · 16:50 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-29 · 10:36 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-28 · 08:30 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-25 · 16:14 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-24 · 20:09 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-23 · 12:01 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-23 · 10:00 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-22 · 15:56 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-22 · 11:55 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-21 · 11:49 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-18 · 11:31 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-17 · 17:26 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-17 · 15:26 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-17 · 09:24 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-14 · 11:07 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-11 · 16:50 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-10 · 10:43 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-09 · 16:38 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-08 · 14:32 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-08 · 10:31 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-08 · 08:30 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-08 · 06:30 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-07 · 18:27 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-07 · 10:25 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-04 · 14:08 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-04 · 10:07 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-03 · 20:03 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-03 · 18:03 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-03 · 14:02 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-03 · 12:01 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-03 · 10:01 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-30 · 09:37 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-27 · 17:21 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-26 · 17:15 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-26 · 13:14 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-26 · 11:13 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-24 · 11:01 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-24 · 00:59 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-21 · 10:43 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-20 · 16:39 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-18 · 12:26 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-17 · 10:19 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-12 · 15:51 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-12 · 13:50 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-11 · 09:43 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-10 · 15:39 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-10 · 13:38 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-10 · 09:37 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-07 · 09:19 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-07 · 07:19 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-07 · 05:18 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-06 · 17:15 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-06 · 13:14 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-05 · 15:09 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-05 · 11:08 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
  • 2026-08-04 · 09:01 GYTconf 0.70“Local Content Register listing has no status column; recorded as unknown (status not asserted).”
Show all 6 receipts
TitleEOI – Halliburton Guyana Inc Technical In…

“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”

confirmed in 91 snapshots · Aug 4 – Nov 11
  • 2026-11-11 · 13:33 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-11 · 11:32 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-10 · 11:26 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-06 · 15:03 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-05 · 08:52 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-04 · 12:47 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-04 · 10:46 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-03 · 12:41 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-03 · 10:40 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-03 · 08:40 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-02 · 16:36 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-11-02 · 10:34 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-30 · 06:15 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-29 · 12:11 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-28 · 16:06 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-21 · 12:48 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-20 · 10:42 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-19 · 16:37 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-19 · 10:36 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-17 · 10:24 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-15 · 16:13 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-15 · 10:12 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-14 · 16:07 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-14 · 10:06 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-12 · 11:54 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-12 · 09:54 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-09 · 15:37 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-08 · 15:31 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-08 · 11:30 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-06 · 17:20 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-06 · 15:19 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-06 · 09:18 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-02 · 16:56 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-02 · 14:55 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-02 · 10:54 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-10-01 · 16:50 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-29 · 10:36 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-28 · 08:30 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-25 · 16:14 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-24 · 20:09 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-23 · 12:01 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-23 · 10:00 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-22 · 15:56 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-22 · 11:55 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-21 · 11:49 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-18 · 11:31 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-17 · 17:26 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-17 · 15:26 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-17 · 09:24 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-14 · 11:07 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-11 · 16:50 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-10 · 10:43 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-09 · 16:38 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-08 · 14:32 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-08 · 10:31 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-08 · 08:30 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-08 · 06:30 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-07 · 18:27 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-07 · 10:25 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-04 · 14:08 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-04 · 10:07 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 20:03 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 18:03 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 14:02 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 12:01 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-09-03 · 10:01 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-30 · 09:37 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-27 · 17:21 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-26 · 17:15 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-26 · 13:14 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-26 · 11:13 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-24 · 11:01 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-24 · 00:59 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-21 · 10:43 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-20 · 16:39 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-18 · 12:26 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-17 · 10:19 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-12 · 15:51 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-12 · 13:50 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-11 · 09:43 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-10 · 15:39 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-10 · 13:38 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-10 · 09:37 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-07 · 09:19 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-07 · 07:19 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-07 · 05:18 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-06 · 17:15 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-06 · 13:14 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-05 · 15:09 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-05 · 11:08 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
  • 2026-08-04 · 09:01 GYTconf 0.95“EOI – Halliburton Guyana Inc Technical Inspection and Diagnosis of Separator System and Proposal for New Separator System.”
DescriptionWe are seeking to engage a qualified vend…

“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”

confirmed in 74 snapshots · Aug 4 – Nov 11
  • 2026-11-11 · 13:51 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-11 · 11:50 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-10 · 11:44 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-06 · 15:21 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-05 · 09:09 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-04 · 13:04 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-04 · 11:04 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-03 · 12:58 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-03 · 10:58 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-03 · 08:57 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-02 · 16:53 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-11-02 · 10:52 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-30 · 06:33 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-29 · 12:28 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-28 · 16:24 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-20 · 10:59 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-19 · 17:34 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-19 · 10:53 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-17 · 10:41 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-15 · 16:30 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-15 · 10:28 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-14 · 16:24 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-14 · 10:22 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-12 · 12:11 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-12 · 10:10 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-09 · 15:53 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-08 · 15:47 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-08 · 11:46 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-06 · 17:36 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-06 · 15:35 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-06 · 09:34 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-02 · 17:12 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-02 · 15:11 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-02 · 11:10 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-10-01 · 17:05 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-29 · 10:52 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-28 · 08:45 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-25 · 16:29 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-24 · 20:24 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-23 · 12:16 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-23 · 10:15 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-22 · 16:11 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-22 · 12:10 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-21 · 12:11 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-18 · 11:45 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-17 · 17:41 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-17 · 09:39 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-14 · 11:21 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-11 · 17:05 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-10 · 10:57 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-09 · 16:53 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-08 · 08:44 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-08 · 06:44 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-07 · 10:38 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-04 · 10:20 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-03 · 20:17 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-09-03 · 10:14 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-30 · 09:50 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-27 · 17:34 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-26 · 11:26 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-24 · 11:14 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-24 · 01:11 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-21 · 10:56 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-20 · 16:51 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-18 · 12:38 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-17 · 10:31 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-12 · 14:02 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-11 · 09:55 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-10 · 09:49 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-07 · 09:31 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-07 · 05:30 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-06 · 17:27 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-06 · 13:25 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”
  • 2026-08-04 · 16:52 GYTconf 0.90“We are seeking to engage a qualified vendor to conduct an evaluation of the current effluent treatment conditions, with specific focus on the existing water separator system. Following a comprehensive diagnosis, the vendor will be required to design and propose a fit-for-purpose water separation so…”

Timeline

First seen2026-08-04
Published2026-08-04

More from Halliburton Guyana Inc.

Want alerts for notices like this?

New notices are added as our collectors find them, each linked back to the document it came from. Alerts are planned. Leave your email to register interest. We don’t send any email yet.

Report an issue with this tender

Spotted a wrong value, a misattributed award, or data that should not be public? Tell us below — every report is reviewed by a person.

View official notice ↗