Tenders/Construction/Supply and Installation of Transmission Mains at Wakenaam, Region # 3

Supply and Installation of Transmission Mains at Wakenaam, Region # 3

Ministry of Public Utilities and Aviation
ClosedConstructionRegion 3 (Essequibo Islands-West Demerara)Reported. Confidence grade B, score 0.75.
Est. valueNot published
Lots1
Status at sourceBid Advertised
LanguageEnglish
First seen2026-09-04
Dotted gold underline = traced to a source · see evidence

How to bid

as the notice states it
  1. Get the bidding documents
    From
    Not published
  2. Prepare the bid security
  3. Deliver the bid
    To
    Not published
  4. Attend the opening

Read from the notice by pattern, each with its receipt below; check it against the official notice ↗ before you bid.

Description

Supply and Installation of Transmission Mains at Wakenaam, Region # 3. The work consists of the installation of approximately 6.5km of 200mm PVC pipes on Wakenaam Island.

Evidence

13 fields · every one traced
Deadline2026-10-29

“sealed envelopes, with the name and address of the bidder, and be clearly marked “Supply and Installation of Transmission Mains at Wakenaam, Region # 3)” and must be delivered to the third address below no later than October 29, 2026 at 9:00am”

Deadline2026-10-06

“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”

confirmed in 20 snapshots · Sep 4 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-10-02 · 03:58 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-10-01 · 11:56 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-10-01 · 03:55 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-30 · 15:53 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-29 · 19:51 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-29 · 03:49 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-22 · 15:29 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-22 · 03:28 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-17 · 19:15 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-15 · 19:09 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-15 · 15:08 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-14 · 15:05 GYTconf 0.95“projected_bid_opening_date: "2026-10-06" — opened 09:00 Guyana time — the portal's listing header reads "Tender Opening- 9:00am on:"”
  • 2026-09-11 · 16:27 GYTconf 0.95“Submission Deadline &Tender Opening- 9:00am on: Oct 06, 2026”
  • 2026-09-11 · 15:56 GYTconf 0.95“Submission Deadline &Tender Opening- 9:00am on: Oct 06, 2026”
  • 2026-09-11 · 11:22 GYTconf 0.95“Submission Deadline &Tender Opening- 9:00am on: Oct 06, 2026”
  • 2026-09-10 · 16:03 GYTconf 0.95“Submission Deadline &Tender Opening- 9:00am on: Oct 06, 2026”
  • 2026-09-10 · 14:31 GYTconf 0.95“Submission Deadline &Tender Opening- 9:00am on: Oct 06, 2026”
  • 2026-09-09 · 12:05 GYTconf 0.95“Submission Deadline &Tender Opening- 9:00am on: Oct 06, 2026”
  • 2026-09-04 · 11:37 GYTconf 0.95“Submission Deadline &Tender Opening- 9:00am on: Oct 06, 2026”
Deadline2026-10-22

“sealed envelopes, with the name and address of the bidder, and be clearly marked “Supply and Installation of Transmission Mains at Wakenaam, Region # 3)” and must be delivered to the third address below no later than October 22, 2026 at 9:00am”

EntityMinistry of Public Utilities and Aviation

“agency: "34-Ministry of Public Utilities and Aviation"”

confirmed in 20 snapshots · Sep 4 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-10-02 · 03:58 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-10-01 · 11:56 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-10-01 · 03:55 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-30 · 15:53 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-29 · 19:51 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-29 · 03:49 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-22 · 15:29 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-22 · 03:28 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-17 · 19:15 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-15 · 19:09 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-15 · 15:08 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-14 · 15:05 GYTconf 0.95“agency: "34-Ministry of Public Utilities and Aviation"”
  • 2026-09-11 · 16:27 GYTconf 0.95“34-Ministry of Public Utilities and Aviation”
  • 2026-09-11 · 15:56 GYTconf 0.95“34-Ministry of Public Utilities and Aviation”
  • 2026-09-11 · 11:22 GYTconf 0.95“34-Ministry of Public Utilities and Aviation”
  • 2026-09-10 · 16:03 GYTconf 0.95“34-Ministry of Public Utilities and Aviation”
  • 2026-09-10 · 14:31 GYTconf 0.95“34-Ministry of Public Utilities and Aviation”
  • 2026-09-09 · 12:05 GYTconf 0.95“34-Ministry of Public Utilities and Aviation”
  • 2026-09-04 · 11:37 GYTconf 0.95“34-Ministry of Public Utilities and Aviation”
Show all 19 receipts
Bid opening2026-10-29

“no later than October 29, 2026 at 9:00am (Guyana Time). Bids will be opened publicly immediately after the deadline for submission of bids”

Bid opening2026-10-22

“no later than October 22, 2026 at 9:00am (Guyana Time). Bids will be opened publicly immediately after the deadline for submission of bids”

Bid opening2026-10-06

“Hard copies of Bids must be submitted in sealed envelopes, with the name and address of the bidder, and be clearly marked “Supply and Installation of Transmission Mains at Wakenaam, Region # 3)” and must be delivered to the third address below no later than October 6, 2026 at 9:00am (Guyana Time). Bids will be opened publicly immediately after the deadline for submission of bids, in the presence of Bidders' representatives who choose to attend at the second address below.”

Document feeGYD 5,000

“A complete set of Bidding documents can be purchased by interested bidder upon payment of a non-refundable fee of Five Thousand Guyana Dollars (G$5,000) or a currency that is freely convertible.”

Bid securitya signed Bid-Securing Declaration

“Bid must be accompanied by a signed Bid-Securing Declaration.”

Regionregion_3

“regions: ["Region 03"]”

confirmed in 20 snapshots · Sep 4 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-10-02 · 03:58 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-10-01 · 11:56 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-10-01 · 03:55 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-30 · 15:53 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-29 · 19:51 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-29 · 03:49 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-22 · 15:29 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-22 · 03:28 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-17 · 19:15 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-15 · 19:09 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-15 · 15:08 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-14 · 15:05 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-11 · 16:27 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-11 · 15:56 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-11 · 11:22 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-10 · 16:03 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-10 · 14:31 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-09 · 12:05 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-04 · 11:37 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
Categoryconstruction

“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”

confirmed in 20 snapshots · Sep 4 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-10-02 · 03:58 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-10-01 · 11:56 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-10-01 · 03:55 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-30 · 15:53 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-29 · 19:51 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-29 · 03:49 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-22 · 15:29 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-22 · 03:28 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-17 · 19:15 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-15 · 19:09 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-15 · 15:08 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-14 · 15:05 GYTconf 0.70“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-11 · 16:27 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-11 · 15:56 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-11 · 11:22 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-10 · 16:03 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-10 · 14:31 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-09 · 12:05 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-04 · 11:37 GYTconf 0.70“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
Statuspublished

“current_state: "Bid Advertised"”

confirmed in 13 snapshots · Sep 14 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-10-02 · 03:58 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-10-01 · 11:56 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-10-01 · 03:55 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-30 · 15:53 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-29 · 19:51 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-29 · 03:49 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-22 · 15:29 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-22 · 03:28 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-17 · 19:15 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-15 · 19:09 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-15 · 15:08 GYTconf 0.95“current_state: "Bid Advertised"”
  • 2026-09-14 · 15:05 GYTconf 0.95“current_state: "Bid Advertised"”
Statusamended

“ADDENDUM # 1: INVITATION TO BID – WORKS”

Statusunknown

“eProcure listing has no status column; recorded as unknown (status not asserted).”

confirmed in 7 snapshots · Sep 4–11
  • 2026-09-11 · 16:27 GYTconf 0.70“eProcure listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-11 · 15:56 GYTconf 0.70“eProcure listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-11 · 11:22 GYTconf 0.70“eProcure listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-10 · 16:03 GYTconf 0.70“eProcure listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-10 · 14:31 GYTconf 0.70“eProcure listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-09 · 12:05 GYTconf 0.70“eProcure listing has no status column; recorded as unknown (status not asserted).”
  • 2026-09-04 · 11:37 GYTconf 0.70“eProcure listing has no status column; recorded as unknown (status not asserted).”
ReferencesGWI-CDB-W102-2026

“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”

confirmed in 10 snapshots · Sep 17 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-10-02 · 03:58 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-10-01 · 11:56 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-10-01 · 03:55 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-30 · 15:53 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-29 · 19:51 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-29 · 03:49 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-22 · 15:29 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-22 · 03:28 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-17 · 19:15 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3" — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
FunderCaribbean Development Bank

“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”

confirmed in 10 snapshots · Sep 17 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-10-02 · 03:58 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-10-01 · 11:56 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-10-01 · 03:55 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-30 · 15:53 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-29 · 19:51 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-29 · 03:49 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-22 · 15:29 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-22 · 03:28 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
  • 2026-09-17 · 19:15 GYTconf 0.70“GWI-CDB-W102-2026 names the Caribbean Development Bank — document_file: "/files/IFB- GWI-CDB-W102-2026 - Wakenaam Transmission Mains Oct_06_2026.pdf"”
Regions (as tagged)Region 3

“regions: ["Region 03"]”

confirmed in 10 snapshots · Sep 17 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-10-02 · 03:58 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-10-01 · 11:56 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-10-01 · 03:55 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-30 · 15:53 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-29 · 19:51 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-29 · 03:49 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-22 · 15:29 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-22 · 03:28 GYTconf 0.95“regions: ["Region 03"]”
  • 2026-09-17 · 19:15 GYTconf 0.95“regions: ["Region 03"]”
TitleSupply and Installation of Transmission M…

“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”

confirmed in 20 snapshots · Sep 4 – Oct 2
  • 2026-10-02 · 15:59 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-10-02 · 03:58 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-10-01 · 11:56 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-10-01 · 03:55 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-30 · 15:53 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-29 · 19:51 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-29 · 03:49 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-22 · 15:29 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-22 · 03:28 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-17 · 19:15 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-15 · 19:09 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-15 · 15:08 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-14 · 15:05 GYTconf 0.95“project_name: "Supply and Installation of Transmission Mains at Wakenaam, Region # 3"”
  • 2026-09-11 · 16:27 GYTconf 0.95“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-11 · 15:56 GYTconf 0.95“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-11 · 11:22 GYTconf 0.95“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-10 · 16:03 GYTconf 0.95“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-10 · 14:31 GYTconf 0.95“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-09 · 12:05 GYTconf 0.95“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
  • 2026-09-04 · 11:37 GYTconf 0.95“Supply and Installation of Transmission Mains at Wakenaam, Region # 3”
DescriptionSupply and Installation of Transmission M…

“Supply and Installation of Transmission Mains at Wakenaam, Region # 3. The work consists of the installation of approximately 6.5km of 200mm PVC pipes on Wakenaam Island.”

Timeline

First seen2026-09-04
Published2026-09-04
Amended2026-09-28
Amended2026-10-20

More from Ministry of Public Utilities and Aviation

Ministry of Public Utilities and AviationReported. Confidence grade C, score 0.59.

Supply, Delivery and Testing of Leakage Management Materials and Equipment

Uncategorised
Value not publishedcloses in 40 days
Ministry of Public Utilities and AviationReported. Confidence grade B, score 0.72.

Rehabilitation of Wisroc Water Treatment Plant (WTP), Linden, Region No. 10.

ConstructionRegion 10
Value not publishedcloses in 19 days
Ministry of Public Utilities and AviationReported. Confidence grade C, score 0.61.

Construction Supervision of Concrete Leading Beacons with Vessel Traffic Service and Port Security Systems

Construction
Value not publishedcloses in 12 days
Ministry of Public Utilities and AviationReported. Confidence grade B, score 0.75.

Installation of Water Supply Systems Region #10 Lots 1and 2

UncategorisedRegion 10
Joshi Construction and Transportation Establishment Three
Value not publishedawarded 2026-09-24
Ministry of Public Utilities and AviationReported. Confidence grade B, score 0.74.

Concrete Leading Beacons with Vessel Traffic Service and Port Security Systems for the Demerara Main Ships Channel

Uncategorised
Lena Engenharia E. Construcoes , Proyectos E. Innovacion Cinco, Excel Guyana Inc, Latitude Geospatial Consultancy Inc (J.V)
Value not publishedawarded 2026-09-24
Ministry of Public Utilities and AviationReported. Confidence grade B, score 0.74.

Extraction of Piles and Removal of Submerged Objects

Uncategorised
Value not publishedclosed 2026-10-20

Want alerts for notices like this?

New notices are added as our collectors find them, each linked back to the document it came from. Alerts are planned. Leave your email to register interest. We don’t send any email yet.

Report an issue with this tender

Spotted a wrong value, a misattributed award, or data that should not be public? Tell us below — every report is reviewed by a person.

View official notice ↗