Tenders/Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear

Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear

Georgetown Public Hospital Corporation
AwardedUncategorisedReported. Confidence grade B, score 0.74.
Deadline—
Bid opening—
Est. valueNot published
Lots1
LanguageEnglish
First seen2026-11-11
Dotted gold underline = traced to a source · see evidence
Award — public record
awarded 2025-11-19 · Unknown
—General MarineGuyanaGYD 75.4M
—General MarineGuyanaGYD 75.4M
—General MarineGuyanaGYD 75.4M
—Cummings ElectricalGuyanaGYD 62.1M
—Tels Engineering ServicesGuyanaGYD 7.8M
—Cummings ElectricalGuyanaGYD 62.1M
—Tels Engineering ServicesGuyanaGYD 7.8M
—Cummings ElectricalGuyanaGYD 62.1M
—Tels Engineering ServicesGuyanaGYD 7.8M

Description

No description was published with this notice.

Evidence

6 fields · every one traced
EntityGeorgetown Public Hospital Corporation

“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”

confirmed in 11 snapshots · Nov 11
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30662"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30663"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30664"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30665"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30691"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30692"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30693"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31092"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>4</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31126"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31127"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
Categoryunknown

“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”

confirmed in 11 snapshots · Nov 11
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30662"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30663"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30664"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30665"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30691"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30692"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30693"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31092"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>4</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31126"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31127"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
Statusawarded

“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”

confirmed in 11 snapshots · Nov 11
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30662"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30663"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30664"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30665"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30691"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30692"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30693"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31092"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>4</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31126"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31127"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
TitleSupply, Installation and Commissioning of…

“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”

confirmed in 11 snapshots · Nov 11
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30662"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30663"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30664"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30665"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30691"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30692"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30693"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31092"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>4</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31126"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31127"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
Show all 7 receipts
Bids Received4

“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”

confirmed in 4 snapshots · Nov 11
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30662"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30663"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31092"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>4</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
Bids Received5

“<tr data-row_id="30664"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”

confirmed in 7 snapshots · Nov 11
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30664"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30665"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30691"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30692"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30693"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31126"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31127"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
Procurement MethodNCB

“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”

confirmed in 11 snapshots · Nov 11
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30661"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30662"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30663"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>4</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30664"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:15 GYTconf 0.95“<tr data-row_id="30665"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30691"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Engineering and Construction Inc</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>66006000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30692"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Tels Engineering Services</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>7800000</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 23:14 GYTconf 0.95“<tr data-row_id="30693"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>Cummings Electrical Company Limited</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>62089494</td><td>G$</td><td>NCB</td><td>5</td><td>08/07/2025</td><td>09/07/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31092"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>4</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31126"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”
  • 2026-11-10 · 22:55 GYTconf 0.95“<tr data-row_id="31127"><td>Georgetown Public Hospital Corporation</td><td>142/2025/46</td><td>General Marine Company</td><td>Supply, Installation and Commissioning of Electrical Equipment (1250KVA Generator, Load Center etc) within the New ACDC Electrical Switchgear</td><td>75407010</td><td>G$</td><td>NCB</td><td>5</td><td>19/11/2025</td><td>20/11/2025</td></tr>”

Timeline

First seen2026-11-11
Awarded2025-11-19
Awarded2025-11-19
Awarded2025-11-19
Awarded2025-07-08
Awarded2025-07-08
Awarded2025-07-08
Awarded2025-07-08
Awarded2025-07-08
Awarded2025-07-08
Awarded2025-07-08
Awarded2025-07-08

More from Georgetown Public Hospital Corporation

Want alerts for notices like this?

New notices are added as our collectors find them, each linked back to the document it came from. Alerts are planned. Leave your email to register interest. We don’t send any email yet.

Report an issue with this tender

Spotted a wrong value, a misattributed award, or data that should not be public? Tell us below — every report is reviewed by a person.