Momin & Son's Construction
As printed in the NPTA’s Tenders Awarded listing: Momin & Son's Construction
Dated 27 Aug 2026.
Buyer
The award
Bids at tender openings
from NPTA’s minutes of tender openings16 openings where the minutes read out a bid from this supplier. Prices are as read out, before evaluation; a bid on several lots of one opening counts once.
No win record: we hold the award for 2 openings it bid at, and give a record from 5. Each bid’s outcome is listed below.
Limits. The minutes we read cover 941 openings from 19 Feb 2026 to 3 Nov 2026; nothing earlier is counted. We hold the award for 409 of them. The NPTA’s awards page lags the openings (the newest award we hold is dated 6 Nov 2026), and an opening reaches its award only through its file number. A bid is this supplier’s only when the name the minutes print matches a name the awards page printed for it, so some of its bids may be missing here.
Won (1)
An award row printed under the opening’s file number names this supplier.
- Rehabilitation of the NDIA Pontoon Located at Abary, Region No.5Opened 4 Aug 2026 · File 331/2026/21Won
- Price read outGYD 3,070,000
The award names others (1)
We hold the award, and no row of it names this supplier.
- Construction of Seosdyke Junction Market Lots 1-5Opened 17 Sept 2026 · File 248/2026/13Award names others
- Lot 1GYD 97,513,605
- Lot 2GYD 93,049,530
- Lot 3GYD 97,513,605
- Lot 4GYD 53,770,710
- Lot 5GYD 348,945,450
No award we hold (14)
Not decided yet, not posted on the awards page yet, or not joined to its opening. Not counted either way.
- Supply & Installation of Transmission Mains at Adventure, Reg #6 (Lots 1-4) Form of Tender Page BSD Not Seen Zeebo & Sons Construction Inc. L2 Zeebo & Sons Construction Inc. L3 Zeebo & Sons Construction Inc. L4Opened 29 Oct 2026 · File 280/2026/34 · title as the minutes print it; no tender pageNo award held
- Lot 1GYD 398,480,000
- Lot 2GYD 410,957,000
- Lot 3GYD 395,179,000
- Lot 4GYD 430,950,000
No award we hold for this file numberMinutes PDF ↗ - Supply & Installation of Transmission Mains at Adventure, Reg #6 (Lots 1-4) Zeebo & Sons Construction Inc. L2 Zeebo & Sons Construction Inc. L3 Zeebo & Sons Construction Inc. L4Opened 29 Oct 2026 · File 280/2026/34 · title as the minutes print it; no tender pageNo award held
- Lot 1GYD 398,480,000
- Lot 2GYD 410,957,000
- Lot 3GYD 395,179,000
- Lot 4GYD 430,950,000
No award we hold for this file numberMinutes PDF ↗ - Supply & Installation of Transmission Mains at Leguan, Reg #3Opened 29 Oct 2026 · File 282/2026/34 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 93,708,000
No award we hold for this file numberMinutes PDF ↗ - Supply & Installation of Transmission Mains at Leguan, Reg #3Opened 29 Oct 2026 · File 282/2026/34 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 93,708,000
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation to Access Bridge at Vreed-en-Vemshchab, Canal #2, West Bank Demerara, Reg #3Opened 29 Oct 2026 · File 421/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 27,143,300
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation to Access Bridge at Vreed-en-Vemshchab, Canal #2, West Bank Demerara, Reg #3Opened 29 Oct 2026 · File 421/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 27,143,300
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation to Access Bridge at Soesdyke, Canal No. 1, West Bank Demerara, Reg #3Opened 29 Oct 2026 · File 422/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 27,007,200
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation to Access Bridge at Soesdyke, Canal No. 1, West Bank Demerara, Reg #3Opened 29 Oct 2026 · File 422/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 27,007,200
No award we hold for this file numberMinutes PDF ↗ - 1. Rehabilitation to Access Bridge at Ooku, Canal No.1., West Bank Demerara, Region No.3Opened 29 Oct 2026 · File 423/2026/21No award held
- Price read outGYD 25,597,800
No award we hold for this file numberMinutes PDF ↗ - 1. Rehabilitation to Access Bridge at Ooku, Canal No.1., West Bank Demerara, Region No.3Opened 29 Oct 2026 · File 423/2026/21No award held
- Price read outGYD 25,597,800
No award we hold for this file numberMinutes PDF ↗ - Drilling of Potable Water Well at Lusignan, ECD, Reg #4Opened 29 Sept 2026 · File 243/2026/34 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 235,777,150
No award we hold for this file numberMinutes PDF ↗ - Drilling of Potable Water Well at Long Creek, Linden Soesdyke Highway, Region #4Opened 29 Sept 2026 · File 244/2026/34No award held
- Price read outGYD 53,865,000
No award we hold for this file numberMinutes PDF ↗ - Drilling of Potable Water Well at Shirley Field Ridley Square, Georgetown, Region #4Opened 29 Sept 2026 · File 245/2026/34No award held
- Price read outGYD 248,453,650
No award we hold for this file numberMinutes PDF ↗ - Construction of Skeldon Market Lots 1-6Opened 17 Sept 2026 · File 247/2026/13 · title as the minutes print it; no tender pageNo award held
- Lot 1GYD 574,340,090
- Lot 2GYD 524,790,485
- Lot 3GYD 528,906,485
- Lot 4GYD 538,138,085
- Lot 5GYD 557,885,435
- Lot 6GYD 558,419,360
No award we hold for this file numberMinutes PDF ↗
How this page is built
Every award here is a row of the National Procurement and Tender Administration’s Tenders Awarded listing, counted the way each tender’s page lists its awards. The names are as the NPTA prints them. We match them to one supplier by rule — the same name, or a spelling at least 90% alike — and have not checked any register for who the supplier is. A value the NPTA does not publish is never shown or added up, and amounts in Guyana and US dollars are totalled apart.
The bids are the rows of the NPTA’s minutes of tender openings whose bidder name matches one of the names above, each with its minutes PDF. A bid on several lots of one opening counts once. An opening is decided when we hold its award: the awards page names the same file number, or names the advert the opening was matched to. Every award row printed under that file number counts, since the awards page can file one contract’s lots under several records. The win record counts decided openings only, never an opening still waiting for its award, and is given from 5 decided openings. An opening whose award names this supplier while no row of its minutes is linked to it is listed under Won and left out of the record: a bid printed under a name we do not match, or in a row we could not read, is found only when it wins, so counting them would count wins and not losses.
An award that is not this supplier’s can be reported from its tender’s page. What each label means is on the methodology page.
Alerts are planned.
Checking back is the manual version. Alerts that bring new notices to you are planned. Leave your email to register interest. We don’t send any email yet.