Renish Construction & Association
As printed in the NPTA’s Tenders Awarded listing: Renish Construction & Association L6
Dated 27 Aug 2025.
Buyer
The award
Bids at tender openings
from NPTA’s minutes of tender openings7 openings where the minutes read out a bid from this supplier. Prices are as read out, before evaluation; a bid on several lots of one opening counts once.
No win record: we hold the award for 3 openings it bid at, and give a record from 5. Each bid’s outcome is listed below.
Limits. The minutes we read cover 941 openings from 19 Feb 2026 to 3 Nov 2026; nothing earlier is counted. We hold the award for 409 of them. The NPTA’s awards page lags the openings (the newest award we hold is dated 6 Nov 2026), and an opening reaches its award only through its file number. A bid is this supplier’s only when the name the minutes print matches a name the awards page printed for it, so some of its bids may be missing here.
The award names others (3)
We hold the award, and no row of it names this supplier.
- 2. Construction of Irrigation Canal and Intake Structure at Crabwood Creek, Region No.6 Lots 1-4 Lot 1- Section 1 (EE: $107,960,000) Lot 2- Section 2 (EE: $107,960,000) Lot 3- Section 3 (EE: $107,960,000) Lot 4- Intake Structure (EE: $16,158,600)Opened 16 Jul 2026 · File 309/2026/21Award names others
- Lot 1GYD 102,621,520
- Lot 2GYD 102,234,880
- Lot 3GYD 102,210,880
- Lot 4GYD 16,048,820
- Rehabilitation of Heavy Duty Bridge of Macaw, East Bank Berbice, Region No. 6Opened 21 May 2026 · File 248/2026/21Award names others
- Price read outGYD 28,860,615
- Rehabiliatation/ Construction of Bridges, Lots, 1-61Opened 25 Feb 2026 · File 06/2026/31Award names others
31 lot prices
- Lot 1GYD 40,130,120
- Lot 2GYD 40,920,584
- Lot 3GYD 35,576,360
- Lot 4GYD 41,421,584
- Lot 5GYD 41,325,184
- Lot 6GYD 37,237,284
- Lot 7GYD 41,011,084
- Lot 8GYD 37,358,784
- Lot 9GYD 37,977,784
- Lot 10GYD 37,977,784
- Lot 11GYD 37,668,784
- Lot 12GYD 37,152,284
- Lot 13GYD 38,880,984
- Lot 14GYD 38,183,784
- Lot 15GYD 41,400,584
- Lot 16GYD 41,348,584
- Lot 17GYD 41,243,584
- Lot 18GYD 41,148,584
- Lot 19GYD 37,536,784
- Lot 20GYD 40,049,884
- Lot 21GYD 37,836,184
- Lot 22GYD 37,526,784
- Lot 23GYD 37,106,784
- Lot 24GYD 37,342,784
- Lot 25GYD 58,497,168
- Lot 26GYD 40,412,684
- Lot 27GYD 40,760,084
- Lot 28GYD 37,489,884
- Lot 29GYD 35,219,360
- Lot 30GYD 56,152,168
- Lot 31GYD 40,665,584
No award we hold (4)
Not decided yet, not posted on the awards page yet, or not joined to its opening. Not counted either way.
- Construction of Port Mourant Market, Region #6, Lots 1-6Opened 17 Sept 2026 · File 246/2026/13 · title as the minutes print it; no tender pageNo award held
- Lot 1GYD 1,532,862,019
- Lot 2GYD 14,835,555
- Lot 3GYD 25,667,250
- Lot 4GYD 2,604,000
- Lot 5GYD 348,573,041
- Lot 6GYD 1,957,004,115
No award we hold for this file numberMinutes PDF ↗ - Construction of Skeldon Market Lots 1-6Opened 17 Sept 2026 · File 247/2026/13 · title as the minutes print it; no tender pageNo award held
- Lot 1GYD 496,192,370
- Lot 2GYD 449,566,543
- Lot 3GYD 485,873,968
- Lot 4GYD 538,775,908
- Lot 5GYD 500,837,728
- Lot 6GYD 509,164,060
No award we hold for this file numberMinutes PDF ↗ - Construction of Reinforced Concrete Bridge at Black Bush Polder, MibicuriOpened 21 May 2026 · File 249/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 131,599,492
No award we hold for this file numberMinutes PDF ↗ - Infrastrusture Devlopment Works at Burma, WCB, Region #5 - Lot 3Opened 4 Mar 2026 · File 36/2026/45 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 130,898,985
No award we hold for this file numberMinutes PDF ↗
How this page is built
Every award here is a row of the National Procurement and Tender Administration’s Tenders Awarded listing, counted the way each tender’s page lists its awards. The names are as the NPTA prints them. We match them to one supplier by rule — the same name, or a spelling at least 90% alike — and have not checked any register for who the supplier is. A value the NPTA does not publish is never shown or added up, and amounts in Guyana and US dollars are totalled apart.
The bids are the rows of the NPTA’s minutes of tender openings whose bidder name matches one of the names above, each with its minutes PDF. A bid on several lots of one opening counts once. An opening is decided when we hold its award: the awards page names the same file number, or names the advert the opening was matched to. Every award row printed under that file number counts, since the awards page can file one contract’s lots under several records. The win record counts decided openings only, never an opening still waiting for its award, and is given from 5 decided openings. An opening whose award names this supplier while no row of its minutes is linked to it is listed under Won and left out of the record: a bid printed under a name we do not match, or in a row we could not read, is found only when it wins, so counting them would count wins and not losses.
An award that is not this supplier’s can be reported from its tender’s page. What each label means is on the methodology page.
Alerts are planned.
Checking back is the manual version. Alerts that bring new notices to you are planned. Leave your email to register interest. We don’t send any email yet.