No description was published with this notice.
“<tr data-row_id="31146"><td>Guyana Energy Agency</td><td>419/2025/02</td><td>M/S Oriana Power Limited (India) (T/F)</td><td>Design, Supply, Installation, and Commissioning of a 3.0 MW (AC) Grid-Tied Solar Photovoltaic System at Cheddi Jagan International Airport (CJIA),Timehri, Guyana</td><td>2487170</td><td>USD</td><td>NCB</td><td>3</td><td>20/11/2025</td><td>21/11/2025</td></tr>”
“<tr data-row_id="31146"><td>Guyana Energy Agency</td><td>419/2025/02</td><td>M/S Oriana Power Limited (India) (T/F)</td><td>Design, Supply, Installation, and Commissioning of a 3.0 MW (AC) Grid-Tied Solar Photovoltaic System at Cheddi Jagan International Airport (CJIA),Timehri, Guyana</td><td>2487170</td><td>USD</td><td>NCB</td><td>3</td><td>20/11/2025</td><td>21/11/2025</td></tr>”
“<tr data-row_id="31146"><td>Guyana Energy Agency</td><td>419/2025/02</td><td>M/S Oriana Power Limited (India) (T/F)</td><td>Design, Supply, Installation, and Commissioning of a 3.0 MW (AC) Grid-Tied Solar Photovoltaic System at Cheddi Jagan International Airport (CJIA),Timehri, Guyana</td><td>2487170</td><td>USD</td><td>NCB</td><td>3</td><td>20/11/2025</td><td>21/11/2025</td></tr>”
“<tr data-row_id="31146"><td>Guyana Energy Agency</td><td>419/2025/02</td><td>M/S Oriana Power Limited (India) (T/F)</td><td>Design, Supply, Installation, and Commissioning of a 3.0 MW (AC) Grid-Tied Solar Photovoltaic System at Cheddi Jagan International Airport (CJIA),Timehri, Guyana</td><td>2487170</td><td>USD</td><td>NCB</td><td>3</td><td>20/11/2025</td><td>21/11/2025</td></tr>”
“<tr data-row_id="31146"><td>Guyana Energy Agency</td><td>419/2025/02</td><td>M/S Oriana Power Limited (India) (T/F)</td><td>Design, Supply, Installation, and Commissioning of a 3.0 MW (AC) Grid-Tied Solar Photovoltaic System at Cheddi Jagan International Airport (CJIA),Timehri, Guyana</td><td>2487170</td><td>USD</td><td>NCB</td><td>3</td><td>20/11/2025</td><td>21/11/2025</td></tr>”
“<tr data-row_id="31146"><td>Guyana Energy Agency</td><td>419/2025/02</td><td>M/S Oriana Power Limited (India) (T/F)</td><td>Design, Supply, Installation, and Commissioning of a 3.0 MW (AC) Grid-Tied Solar Photovoltaic System at Cheddi Jagan International Airport (CJIA),Timehri, Guyana</td><td>2487170</td><td>USD</td><td>NCB</td><td>3</td><td>20/11/2025</td><td>21/11/2025</td></tr>”
New notices are added as our collectors find them, each linked back to the document it came from. Alerts are planned. Leave your email to register interest. We don’t send any email yet.