Tenders/Design Supply Installation and Commissioning of Solar Photovoltaic Systems at 17 Location in the Hinterland

Design Supply Installation and Commissioning of Solar Photovoltaic Systems at 17 Location in the Hinterland

Guyana Energy Agency
AwardedUncategorisedB0.74
Deadline—
Bid opening—
Est. valueNot published
Bid securityNot published
Submit toNot published
Lots1
LanguageEnglish
First seen2026-06-12
Dotted gold underline = traced to a source · see evidence
Award — public record
awarded 2026-05-07 · Unknown
—Green Energy Electrical ServicesGuyanaGYD 78.5M

Description

No description was published with this notice.

Evidence

3 fields · every one traced
EntityGuyana Energy Agency

“<tr data-row_id="31919"><td>Guyana Energy Agency </td><td>42/2026/02</td><td>Green Energy Electrical Services </td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems at 17 Location in the Hinterland</td><td>78490637</td><td>G$</td><td>NCB</td><td>6</td><td>07/05/2026</td><td>08/05/2026</td></tr>”

Statusawarded

“<tr data-row_id="31919"><td>Guyana Energy Agency </td><td>42/2026/02</td><td>Green Energy Electrical Services </td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems at 17 Location in the Hinterland</td><td>78490637</td><td>G$</td><td>NCB</td><td>6</td><td>07/05/2026</td><td>08/05/2026</td></tr>”

TitleDesign Supply Installation and Commission…

“<tr data-row_id="31919"><td>Guyana Energy Agency </td><td>42/2026/02</td><td>Green Energy Electrical Services </td><td>Design Supply Installation and Commissioning of Solar Photovoltaic Systems at 17 Location in the Hinterland</td><td>78490637</td><td>G$</td><td>NCB</td><td>6</td><td>07/05/2026</td><td>08/05/2026</td></tr>”

Timeline

First seen2026-06-12
Awarded2026-05-07

More from Guyana Energy Agency

Don’t miss the next one.

New notices are added as our collectors find them, each linked back to the document it came from. Alerts are next — one email when they land.

Report an issue with this tender

Spotted a wrong value, a misattributed award, or data that should not be public? Tell us below — every report is reviewed by a person.