Kraft Innovation Momementum
As printed in the NPTA’s Tenders Awarded listing: Kraft Innovation Momementum Inc.
1 award prints no date.
Buyer
The award
Bids at tender openings
from NPTA’s minutes of tender openings42 openings where the minutes read out a bid from this supplier. Prices are as read out, before evaluation; a bid on several lots of one opening counts once.
Won 1 of the 26 decided openings it bid at, Mar–Oct 2026.
An opening is decided when we hold its award. A win is an award row naming this supplier. 16 other openings it bid at have no award we hold and are not counted.
Limits. The minutes we read cover 941 openings from 19 Feb 2026 to 3 Nov 2026; nothing earlier is counted. We hold the award for 409 of them. The NPTA’s awards page lags the openings (the newest award we hold is dated 6 Nov 2026), and an opening reaches its award only through its file number. A bid is this supplier’s only when the name the minutes print matches a name the awards page printed for it, so some of its bids may be missing here.
Won (1)
An award row printed under the opening’s file number names this supplier.
- Rehabilitate Mild Steel High Grade Crystallizer with Stainless Steel at Blairmont EstateOpened 7 Jul 2026 · File 294/2026/21Won
- Price read outGYD 23,470,000
Printed at this opening as: Kraft Innovation Momentum Inc
The award names others (25)
We hold the award, and no row of it names this supplier.
- 1. Rehabilitation of Timber Bridge at Victoria, East Coast Demerara, Region No.4Opened 8 Oct 2026 · File 400/2026/21Award names others
- Price read outNot readAs printed: 22 Kraft Innovation Momentum Inc Form of Tender Page Not Completed & Signed $ 285,984 Caricom ✔ ✔ X 2
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Seosdyke Junction Market Lots 1-5Opened 17 Sept 2026 · File 248/2026/13Award names others
- Lot 1GYD 97,870,122
- Lot 2GYD 97,870,122
- Lot 3GYD 97,870,122
- Lot 4GYD 58,551,442
- Lot 5GYD 354,925,826
Printed at this opening as: Kraft Innovation Momentum Inc.
- Construction of Little Diamond-Herstelling NDC BuildingOpened 18 Aug 2026 · File 208/2026/13Award names others
- Price read outGYD 75,194,900
Printed at this opening as: Kraft Innovation Momentum Inc.
- Construction of Bloomfield-Whim NDC BuildingOpened 18 Aug 2026 · File 209/2026/13Award names others
- Price read outGYD 77,331,400
Printed at this opening as: Kraft Innovation Momentum Inc.
- Construction of Tuschen-Uitvlugt NDC BuildingOpened 18 Aug 2026 · File 210/2026/13Award names others
- Price read outGYD 68,522,400
Printed at this opening as: Kraft Innovation Momentum Inc.
- Construction of Best-Klien Pouderyon NDCOpened 18 Aug 2026 · File 211/2026/13Award names others
- Price read outGYD 73,211,100
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Access Road at Good Faith Landfill, Region No.5Opened 16 Jul 2026 · File 155/2026/13Award names others
- Price read outGYD 73,995,600
Printed at this opening as: Kraft Innovation Momentum Inc.
- 2. Construction of Irrigation Canal and Intake Structure at Crabwood Creek, Region No.6 Lots 1-4 Lot 1- Section 1 (EE: $107,960,000) Lot 2- Section 2 (EE: $107,960,000) Lot 3- Section 3 (EE: $107,960,000) Lot 4- Intake Structure (EE: $16,158,600)Opened 16 Jul 2026 · File 309/2026/21Award names others
- Lot 1GYD 104,928,000
- Lot 2GYD 104,228,000
- Lot 3GYD 104,178,000
- Lot 4GYD 94,756,000
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Access Bridge at Coglan Dam, West Bank Demerara, Region No. 3 Lots 1-4Opened 16 Jul 2026 · File 310/2026/21Award names others
- Price read outGYD 27,830,000
Printed at this opening as: Kraft Innovation Momentum Inc. Lot 1
- 3. Rehabilitation of the NDIA Pontoon located at Adventure, Region No.6Opened 16 Jul 2026 · File 311/2026/21Award names others
- Price read outGYD 53,120,000
Printed at this opening as: Kraft Innovation Momentum Inc.
- Rehabilitation of Building & Catwalk to Wharf for Blairmont Estae - GUYSUCOOpened 7 Jul 2026 · File 296/2026/21Award names others
- Price read outGYD 22,179,500
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Daycare Centre, Region NO.4 - Guayna Police ForceOpened 30 Jun 2026 · File 387/2026/51Award names others
- Price read outGYD 339,946,450
Printed at this opening as: Kraft Innovation Momentum Inc.
- Construction of Teaching Block at F.E Pollard Primary SchoolOpened 25 Jun 2026 · File 314/2026/40Award names others
- Price read outGYD 385,387,500
Printed at this opening as: Kraft Innovation Momentum Inc.
- Rehabilitation of East Ruimveldt Market, Lots 1-5Opened 20 May 2026 · File 97/2026/13Award names others
- Lot 1GYD 194,869,400
- Lot 2Not printed
- Lot 3Not printed
- Lot 4Not printed
- Lot 5Not printed
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Buxton/Friendship MarketOpened 20 May 2026 · File 98/2026/13Award names others
- Price read outGYD 472,891,136
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Pouderoyen Market, Lots 1-3Opened 20 May 2026 · File 99/2026/13Award names others
- Lot 1GYD 912,864,155
- Lot 2Not printed
- Lot 3Not printed
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Officer's Club at Lusignan, Region No. 4Opened 12 May 2026 · File 199/2026/51Award names others
- Price read outGYD 155,999,419
Printed at this opening as: Kraft Innovation Momentum Inc
- Reconstruction of Grove Police Station-Guyana Police ForceOpened 12 May 2026 · File 200/2026/51Award names others
- Price read outGYD 208,304,774
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Accessway Dora Academy Phase 2 - Region No. 4Opened 12 May 2026 · File 201/2026/51Award names others
- Price read outGYD 99,508,185
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of Spring Hall Sluice, region NO. 5Opened 14 Apr 2026 · File 169/2026/21Award names others
- Price read outGYD 524,012,318
Printed at this opening as: Kraft Innovation Momentum Inc.
- Construction of New Wing at Mon Repose Primary SchoolOpened 7 Apr 2026 · File 05/2026/74Award names others
- Price read outNot readAs printed: 5 Kraft Innovation Momentum Inc Form of Tender Page Not Seen $ 2,000,000 Nafico ✔ ✔ ✔ 2
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of New Wing at Mon Repos Primary SchoolOpened 7 Apr 2026 · File 06/2026/74Award names others
- Price read outGYD 97,469,600
Printed at this opening as: Kraft Innovation Momentum Inc.
- Construction of Rosignol Fire StationOpened 2 Apr 2026 · File 96/2026/51Award names others
- Price read outGYD 194,432,637
Printed at this opening as: Kraft Innovation Momentum Inc.
- Construction of National Vocational CentreOpened 26 Mar 2026 · File 116/2026/47Award names others
- Price read outGYD 115,391,880
Printed at this opening as: Kraft Innovation Momentum Inc
- Construction of 195 Rubble Mound Groyne Along the Foreshores of Aberdeen/Three FriendsOpened 24 Mar 2026 · File 93/2026/21Award names others
- Price read outGYD 186,100,000
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold (16)
Not decided yet, not posted on the awards page yet, or not joined to its opening. Not counted either way.
- 1. Construction of Drainage Structure at No.49 Stanleytown, New Amsterdam, Region No.6 (EE$36,086,600) RETENDEROpened 8 Oct 2026 · File 397/2026/21No award held
- Price read outNot readAs printed: 44 Kraft Innovation Momentum Inc. Form of Tender Page Not Completed & Signed 721,732$ Caricom ✔ ✔ X 2
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold for this file numberMinutes PDF ↗ - Construction of Plaisance Market Lots 1-4Opened 18 Aug 2026 · File 213/2026/13 · title as the minutes print it; no tender pageNo award held
- Lot 1GYD 407,540,272
- Lot 2GYD 339,843,840
- Lot 3Not printed
- Lot 4Not printed
Printed at this opening as: Kraft Innovation Momentum Inc
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation of Building and Upgrading the Lab at Albion EstateOpened 7 Jul 2026 · File 295/2026/21No award held
- Price read outGYD 52,956,500
Printed at this opening as: Kraft Innovation Momentum Inc
No award we hold for this file numberMinutes PDF ↗ - Construction of Reinforced Concrete Bridge at Black Bush Polder, MibicuriOpened 21 May 2026 · File 249/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 121,444,628
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold for this file numberMinutes PDF ↗ - Construction of Dorathy Bailey Health CentreOpened 14 May 2026 · File 236/2026/47 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 196,843,219
Printed at this opening as: Kraft Innovation Momentum Inc
No award we hold for this file numberMinutes PDF ↗ - Construction of Region No.3 HeadquartersOpened 12 May 2026 · File 202/2026/51 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 325,779,004
Printed at this opening as: Kraft Innovation Momentum Inc
No award we hold for this file numberMinutes PDF ↗ - Upgrade of Kara Kara Landfill Site, Reg #10Opened 29 Apr 2026 · File 75/2026/13 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 40,440,750
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation of iNternal Roads at Mahdia Landfill, Reg #8Opened 29 Apr 2026 · File 76/2026/13 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 36,892,538
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold for this file numberMinutes PDF ↗ - Establishment of MG Research Facility NAREI Mon ReposOpened 14 Apr 2026 · File 156/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 39,483,145
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation of Concrete Bridge at Foulis Hole Cultivation Right Bank Abary CreekOpened 14 Apr 2026 · File 170/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 37,537,448
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold for this file numberMinutes PDF ↗ - Rehabilitation of Concrete Bridge at Esah & Jacob Along Phase 2 All Weather RoadOpened 14 Apr 2026 · File 172/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 27,265,613
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold for this file numberMinutes PDF ↗ - Extension of Timehri Nursery SchoolOpened 7 Apr 2026 · File 08/2026/74 · title as the minutes print it; no tender pageNo award held
- Price read outNot readAs printed: 4 Kraft Innovation Momentum INC Form of tender page not completed & signed $ 700,000 Nafico ✔ ✔ X 1
Printed at this opening as: Kraft Innovation Momentum INC
No award we hold for this file numberMinutes PDF ↗ - Construction of 1.5km All Weather Road at Britannia Cultivation AreaOpened 7 Apr 2026 · File 127/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 66,156,300
Printed at this opening as: Kraft Innovation Momentum Inc.
No award we hold for this file numberMinutes PDF ↗ - Construction of AI Cattle Pen, Mon ReposOpened 7 Apr 2026 · File 142/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 33,216,807
Printed at this opening as: Kraft Innovation Momentum Inc
No award we hold for this file numberMinutes PDF ↗ - Construction of Cumberland Fire StationOpened 2 Apr 2026 · File 95/2026/51 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 413,734,984
Printed at this opening as: Kraft Innovation Momentum Inc
No award we hold for this file numberMinutes PDF ↗ - Reconstruction of NAREI Office at Timehri, EBD, Region #4Opened 19 Mar 2026 · File 86/2026/21 · title as the minutes print it; no tender pageNo award held
- Price read outGYD 46,370,394
Printed at this opening as: Kraft Innovation Momentum Inc
No award we hold for this file numberMinutes PDF ↗
- Not printed
- : the row prints no price: a dash, an empty cell, or a note.
- Not read
- : the row prints an amount we did not read as the price: our reader took it for the bid security, or could not place it. It may be the price. The row is shown as printed, and is not ranked.
How this page is built
Every award here is a row of the National Procurement and Tender Administration’s Tenders Awarded listing, counted the way each tender’s page lists its awards. The names are as the NPTA prints them. We match them to one supplier by rule — the same name, or a spelling at least 90% alike — and have not checked any register for who the supplier is. A value the NPTA does not publish is never shown or added up, and amounts in Guyana and US dollars are totalled apart.
The bids are the rows of the NPTA’s minutes of tender openings whose bidder name matches one of the names above, each with its minutes PDF. A bid on several lots of one opening counts once. An opening is decided when we hold its award: the awards page names the same file number, or names the advert the opening was matched to. Every award row printed under that file number counts, since the awards page can file one contract’s lots under several records. The win record counts decided openings only, never an opening still waiting for its award, and is given from 5 decided openings. An opening whose award names this supplier while no row of its minutes is linked to it is listed under Won and left out of the record: a bid printed under a name we do not match, or in a row we could not read, is found only when it wins, so counting them would count wins and not losses.
An award that is not this supplier’s can be reported from its tender’s page. What each label means is on the methodology page.
Alerts are planned.
Checking back is the manual version. Alerts that bring new notices to you are planned. Leave your email to register interest. We don’t send any email yet.